
Shahan Company · Prime urban high-rise zone
Cavalli Tower
- Entry (USD)
- $78k – $220k+
- Gross yield est.
- 6.8% – 8.5%
- Service fee
- $85 – $150 / mo
- Unit types
- Studio – 3BR branded flats
Erbil · Central / 100m–Airport link · Boulevard Development
Central high-rise apartments linking Erbil’s 100m Road and Airport Road corridor. Built for expat and young-professional leasing, with 7.2% – 8.8% published gross yields and active developer-contract resales.
Erbil Boulevard sits in the middle of Erbil’s rental engine: close enough to the Golden Zone and Airport Road to attract corporate staff and NGO contractors, yet priced well below flagship Gulan landmarks. Entry studios start around $85,000 and larger three-bedroom layouts run past $240,000, while published gross yields of 7.2% – 8.8% reflect brisk leasing turnover. Most units still change hands through Boulevard Development’s office contract rather than independent Government Tapu, so closing math hinges on the transfer fee and Compound NOC.
| City | Erbil |
|---|---|
| Corridor / ring road | Central / 100m–Airport link · Gulan Street (40m) & Golden Zone Guide |
| Developer | Boulevard Development |
| Masterplan size / scale | Multi-tower central high-rise development linking the 100m Road and Airport Road axis with podium access and gated tower lobbies |
| Property types | Residential Tower |
| Unit types & sizes | Studios, 1BR, 2BR and 3BR apartments; compact layouts geared toward single expats and couples alongside family 2–3BR stacks |
| Price band (USD) | Apartments: $85,000 – $240,000+Entry bands across current developer and resale stock |
| Estimated monthly rent (USD) | $600 – $1,350 / mo |
| Gross yield | 7.2% – 8.8% gross |
| Title track | Developer ContractResales and maturing blocks predominantly trade by assigning the developer sales agreement (Grêbestî Kompanya) in Boulevard Development’s administration office; confirm block-level Tapu subdivision status per unit. |
| Monthly service fee | $90 – $160 / mo |
| Power / Runaki infrastructure | Tower supply with building backup; confirm Runaki metering per block |
| $50,000 residency | $50k Residency EligibleSubject to the developer’s confirmation letter and Residency Directorate clearance |
| Reference unit | 2BR apartment · $145,000 · 125m² · $1,160 / m²KRG Property reference unit used for $ / m² and the calculator preset; indicative, not a quoted price |
| Residency eligibility | Every layout from $85,000 up clears the $50,000 KRG residency threshold for foreign buyers |
Benchmarks compiled November 2026 from developer price lists, partner brokerage listings and resale transactions. Methodology
Demand at Erbil Boulevard splits cleanly between furnished smaller units rented to consultants on 6-to-12-month contracts and larger two- and three-bedroom apartments leased to families working along the 100m and Gulan axes. Every unit tier sits comfortably above the $50,000 foreign residency floor.
| Unit type | Indicative size | Entry price band (USD) | Monthly rent band (USD) |
|---|---|---|---|
| Studio | 58m² – 75m² | $85,000 – $105,000 | $600 – $720 |
| 1-Bedroom | 80m² – 105m² | $105,000 – $140,000 | $720 – $900 |
| 2-Bedroom (ref. tier) | 115m² – 145m² | $135,000 – $185,000 | $880 – $1,150 |
| 3-Bedroom | 165m² – 210m² | $185,000 – $240,000+ | $1,100 – $1,350 |
Furnished studios and one-bedroom flats normally achieve the top end of the 7.2% – 8.8% gross yield range because corporate tenants pay a convenience premium for turn-key apartments near the airport link. Unfurnished three-bedroom flats trade at a lower gross yield percentage but hold tenants for longer multi-year leases; see our landlord and property management guide for furnishing payback norms.
Our reference unit is a two-bedroom apartment at $145,000 for 125m², or $1,160 / m². That sits 4% above the average across our Erbil apartment reference units ($1,112 / m², range $713 / m² to $1,879 / m²). It undercuts Golden Square towers such as MRF Quattro & Star Towers ($1,214 / m²) and Park View ($1,258 / m²) while competing directly with Cavalli Tower ($1,353 / m²).
| Line | Developer contract resale | Subdivided Tapu (if issued) |
|---|---|---|
| Purchase price | $145,000 | $145,000 |
| Tapu registration (~3% of 80% assessed + stamps) | $0 | $3,730 |
| Developer name-change fee (benchmark) | $1,500 | $0 |
| Buyer brokerage (1.5%) | $2,175 | $2,175 |
| Independent legal, title & NOC checks | $750 | $750 |
| All-in acquisition cost | $149,425 | $151,655 |
| Gross yield at $950 / month | 7.9% | 7.9% |
| Annual service fee ($120 / mo) + 5% vacancy | $2,010 | $2,010 |
| Net yield on all-in cost | 6.3% | 6.2% |
At $950 a month, gross yield is 7.9%. Deducting $120 a month in service fees ($1,440 a year) and a 5% vacancy reserve leaves 6.3% net on all-in cost—or around 5.6% if you model the statutory 10% annual rental revenue tax. Under a developer contract assignment, closing costs total $4,425 versus $6,655 on a full Tapu transfer, assuming the developer’s name-change fee sits near our $1,500 benchmark.
Monthly building charges run between $90 and $160 ($1,080 to $1,920 a year), placing Erbil Boulevard in the upper-mid tier alongside Cavalli Tower. Fees cover 24-hour lobby security, CCTV, high-speed lift maintenance, common-area cleaning and shared generator infrastructure.
Power billing is the single operational item to confirm block by block before signing. Delivered towers run 24-hour supply, combining national grid access with building backup generators, while Erbil’s Runaki 24-hour continuous grid rollout is progressively replacing diesel Ampere charges. Confirm whether the building’s Runaki meter is already active for your specific floor and whether generator standing charges sit inside or outside the monthly service bill.
Erbil Boulevard trades primarily on developer sales agreements (Grêbestî Kompanya) across maturing phases. Ownership transfers inside Boulevard Development’s administration office rather than at the state Tapu Directorate, so buyer due diligence follows a strict sequence:
Confirm the master parcel’s Kurdistan Board of Investment licence and Master Tapu registration, ensuring the specific tower and unit number match the developer’s master file.
Require a No Objection Certificate confirming zero overdue installments, zero unpaid service fees and settled electricity/generator balances before handing over purchase funds.
Developer transfer fees across Erbil are private charges ($500 – $3,500+ or 1% – 2% of contract value) rather than a fixed state tariff. Confirm the exact fee split with the seller in writing, and verify that any installment lock-up threshold (typically 30% – 50%+) has been cleared.
Diaspora buyers signing remotely need a unit-specific Special Power of Attorney (Wakalay Taybat) executed at an Iraqi Embassy with a valid Unified National Card; read our Embassy POA walkthrough.
Positioned along the link between the 100m Road and Airport Road, Erbil Boulevard captures tenants who work in the Gulan & Golden Zone or commute via the airport belt without paying Gulan’s top-floor price per m². Buyers weighing central yield towers against outer ring-road stock should compare Erbil Boulevard against Wavey Avenue on the modern ring-road corridor and read our Gulan Street vs. Airport Road towers comparison.


The calculator opens with our reference 2BR apartment on a secondary developer-contract assignment. Toggle the pathway to Ready Government Tapu to compare ~3% state registration against the developer’s office fee, or switch buyer profile to Foreign National or Diaspora.
Pre-filled with the 2br apartment: $145,000, 125 m², secondary resale via developer office contract assignment, $950 rent and $120 service a month. Every figure stays editable.
Calculate Closing Costs & Net Yield for Erbil BoulevardErbil Boulevard trades primarily through developer sales agreements (Grêbestî Kompanya) and maturing handover phases inside Boulevard Development’s office. Always verify with the developer administration whether your specific tower and floor have completed subdivision or remain on the Master Tapu.
Published gross yields run from 7.2% to 8.8%. On our $145,000 two-bedroom reference unit renting at $950 a month, gross yield is 7.9% and net yield after $120/month service fees and a 5% vacancy allowance is approximately 6.4%.
Service charges typically run between $90 and $160 per month depending on unit size, covering 24/7 security, lift upkeep, common areas and building plant. Confirm separately whether Runaki 24-hour grid metering is live or whether backup generator Amperes are billed alongside the fee.
Yes. Every layout from studios ($85,000+) upward clears the $50,000 residential threshold under KRG residency rules, provided the project’s investment licence is current and the developer issues the confirmation letter.
Under a developer contract assignment, expect a private name-change fee ($500 to $3,500+ or 1%–2% by developer schedule), standard 1%–2% brokerage, and a mandatory Compound NOC clearing all service and utility bills.
Unit sourcing
We check live resale and maturing-phase inventory across Erbil Boulevard, confirm the exact transfer fee, NOC balance and Runaki meter status for each unit, and send a priced USD shortlist.
Your reference is KRG-0000-0000. Keep it for any follow-up.